Posiva  
Search
   

Download file (16.5 MB)
Summary

Workreport 2008-3

Compilation and Analysis of Hydrogeological Responses to Field Activities in Olkiluoto

Vaittinen, T., Nummela, J. & Ahokas, H.
23.06.2008

Download file (5.5 MB)
Summary

Workreport 2008-2

Ground Magnetic Survey at Olkiluoto 2007

Tarvainen, A-M & Lahti, M.
23.06.2008

Download file (3.2 MB)
Summary

Workreport 2008-1

ONKALO - Main Drawings in 2007

Posiva Oy
16.06.2008

Download file (6.2 MB)
Summary

Workreport 2007-109

Biosphere analysis for selected cases in TILA-99 and in KBS-3H safety evaluation, 2007

Broed, R., Avila, R., Bergström, U., Hjerpe, T. & Ikonen, A.T.K.
19.02.2009

Download file (9.9 MB)
Summary

Workreport 2007-108

Landscape Model Configuration for Biosphere Analysis of Selected Cases in TILA-99 and in KBS-3H Safety Evaluation, 2007

Broed, R.
18.09.2008

Download file (223.1 KB)
Summary

Workreport 2007-107

Models used in the SFR1 SAR-08 and KBS-3H safety assessments for calculation of C-14 doses

Avila, R. & Pröhl, G.
06.06.2008

Download file (1.6 MB)
Summary

Workreport 2007-106

Core Drilling of Drillholes ONK-PP115 – ONK-PP120 in ONKALO at Olkiluoto 2007

Pohjolainen, E.
16.06.2008

Download file (14.2 MB)
Summary

Workreport 2007-105

KBS-3H Design Description 2006

Autio, J., Berghäll, J., Börgesson, L., Eriksson, M., Hagros, A., Johansson, E., Kotola, R., Parkkinen, I., Rönnqvist, P-E. & Sandén, T.
25.08.2009

Download file (556.1 KB)
Summary

Workreport 2007-104

Estimated Quantities of Residual Materials in a KBS-3H Repository at Olkiluoto

Hagros, A.
08.12.2009

Download file (920.2 KB)
Summary

Workreport 2007-103

Assessment of the Concentration Limits for Radionuclides for Posiva

Grive, M., Montoya, V. & Duro,L.
16.06.2008