|
Download file (1.2 MB) |
Workreport 2008-5 Core Drilling of Deep Borehole OL-KR48 at Olkiluoto in Eurajoki 2007 Toropainen, V. |
|
Download file (2.6 MB) |
Workreport 2008-4 A Welding System for Spent Fuel Canister Lid Suikki, M. & Wendelin, T. |
|
Download file (16.5 MB) |
Workreport 2008-3 Compilation and Analysis of Hydrogeological Responses to Field Activities in Olkiluoto Vaittinen, T., Nummela, J. & Ahokas, H. |
|
Download file (5.5 MB) |
Workreport 2008-2 Ground Magnetic Survey at Olkiluoto 2007 Tarvainen, A-M & Lahti, M. |
|
Download file (3.2 MB) |
Workreport 2008-1 ONKALO - Main Drawings in 2007 Posiva Oy |
|
Download file (6.2 MB) |
Workreport 2007-109 Biosphere analysis for selected cases in TILA-99 and in KBS-3H safety evaluation, 2007 Broed, R., Avila, R., Bergström, U., Hjerpe, T. & Ikonen, A.T.K. |
|
Download file (9.9 MB) |
Workreport 2007-108 Broed, R. |
|
Download file (223.1 KB) |
Workreport 2007-107 Models used in the SFR1 SAR-08 and KBS-3H safety assessments for calculation of C-14 doses Avila, R. & Pröhl, G. |
|
Download file (1.6 MB) |
Workreport 2007-106 Core Drilling of Drillholes ONK-PP115 – ONK-PP120 in ONKALO at Olkiluoto 2007 Pohjolainen, E. |
|
Download file (14.2 MB) |
Workreport 2007-105 KBS-3H Design Description 2006 Autio, J., Berghäll, J., Börgesson, L., Eriksson, M., Hagros, A., Johansson, E., Kotola, R., Parkkinen, I., Rönnqvist, P-E. & Sandén, T. |






