Databank

Working reports


Posiva's working reports are used to publish research results related to the practical aspects of the final disposal of spent nuclear fuel. Approximately one hundred working reports are published every year, usually in Finnish or English. The reports are written by Posiva employees or specialists from third party organisations. The working reports are an important tool for distributing the results of research work. All working reports are published on the Posiva website.



Yhteensä 1514 hakutulosta
Sivu

Workreport 2016-37

The Greenland Analogue Project: Data and Processes

Harper, J., Brown, J., Hubbard, A., Doyle, S., Fitzpatrick, A., Ruskeeniemi, T., Engström, J., Claesson Liljedahl, L., Kontula, A., Liimatainen, J., Pere, T., Hobbs, M., Hirschorn, S., Kennell, L., Jones, G., Drake, H., Follin, S., Frape, S., Henkemans, E., Graly, J., Harrington, J., Humphrey, N., Hansson, K., Jansson, P., Lindbäck, K., Pettersson, R., Kinnbom, P., Klint Knud, E., van As, D, Tullborg, E.-L.
10.04.2017

Workreport 2016-36

SLUG tests in PP- and PVP-holes at Olkiluoto in 2015

Pentti, E., Hinkkanen, H.
28.09.2016

Workreport 2016-31

ONKALO POSE Experiment – Laboratory Determination of Density, Porosity and Mechanical Anisotropy of Gneiss and Granite

Jacobsson, L., Sandström, J., Flansbjer, M., Sjögren, T., Brander, L.
18.11.2016

Workreport 2016-30

Normal Loading and Shear Tests on Rock Joints from Olkiluoto

Jacobsson, L., Flansbjer, M., Andersson, L., Appelquist, K.
16.11.2016

Workreport 2016-29

Geophysical Drillhole Logging and Imaging in Pilot Hole ONK-PH28 at Olkiluoto in Autumn 2015

Tiensuu, K., Heikkinen, E., Kiuru, R., Ravimo, I.
16.03.2017

Workreport 2016-27

Design and Construction of Equipment and Experimental Deposition Holes, in ONKALO Demonstration Tunnel 2

Railo, A., Laitinen, I. (ed.), Mustonen, S., Kosunen, P., Joutsen, A., Mellanen, S., Ikonen, A., Hollmen, K., Nuijten, G.
04.01.2017

Yhteensä 1514 hakutulosta
Sivu

Share article: