Experiment 4. POPLU

POPLU deposition tunnel end plug experiment will be implemented in ONKALO demonstration area at the planned disposal depth within POPLU project jointly by Posiva and SKB.


  • Planning and design 2012-2013.

  • Construction and implementation 2013-2014.

  • Testing activities 2014-2015.

  • Reinforced low pH concrete is the main component in the wedge plug. The plug structure is a composite plug and a modified backfill section is needed behind the plug for experimental purposes. Length of the plug is 6 meters and the diameter is 5,5 meter.

  • POPLU and DOMPLU will be evaluated together.

POPLU Demo4-tulppa-5
© Posiva

This Poster can be seen at POPLU site after excavations are ready and informs visitors about Experiment details.

DOPAS POPLU POSTER ONKALO D7 8 (pdf) (3 MB)