The research leading to these results has received funding from the European Union's European Atomic Energy Community's (Euratom) Seventh Framework Programme FP7/2007-2013 under grant agreement no 323273, the DOPAS project.
WP1 Coordination and management
Task 1.1 Organisation of project management meetings
Task 1.2.Coordination of project management with project plan and project risks
Task 1.3 Coordination of project reporting and publications
WP2 Definition of requirements and design basis of the plugs and seals to be demonstrated
Task 2.1 Design basis
Task 2.2 Reference designs
Task 2.3 Strategies of demonstrating conformity of reference design to design basis
Task 2.4 Final reporting of WP2
WP3 Design and technical construction feasibility of the plugs and seals
Task 3.1 Design of plugs and seals
Task 3.2 Laboratory work for materials' characterisation and testing
Task 3.3 Metric scale test
Task 3.4 Installation/construction of the demonstration plug/seal experiments
Task 3.5 Coordination and integration of results – Final reporting of WP3
WP 4 Appraisal of plug and seal system's function
Task 4.1 Mock up test and Full Scale Seal
Task 4.2 EPSP test, loading and monitoring phase
Task 4.3 Pressurisation and monitoring of DOMPLU plug at Äspö
Task 4.4 POPLU plug experiment's leakage measurements and monitoring
Task 4.5 Production of WP4 Integrated Report
WP 5 Performance assessment of plugs and seals system
Task 5.1 Performance assessment of (parts of) the plug and seal systems and identification of the relevant tools for predicting the behaviour of a complete sealing system
Task 5.2 Conceptual models and simulation of relevant processes and their evolution within individual sealing components
Task 5.3 Development of conservative PA methodology and models for analysing the complete system behaviour
Task 5.4 Integration of WP5 task reports
WP6 Integrating analysis including cross-review of each other's work
Task 6.1 Planning for the Integrating Analysis
Task 6.2 Programme on exchange of expert staff
Task 6.3 Expert Group for the peer review using the EE process and its documentation
Task 6.4 Final technical summary reporting of the DOPAS project
WP7 Dissemination
Task 7.1 Dissemination and exploitation plan
Task 7.2 Planning, implementing and disseminating the outcomes of "Plug and seal training workshop"
Task 7.3 Organisation in cooperation with the IGD-TP an international seminar/conference in 2016
Task 7.4 Publishing and presentation of public results of the DOPAS activities