The research leading to these results has received funding from the European Union's European Atomic Energy Community's (Euratom) Seventh Framework Programme FP7/2007-2013 under grant agreement no 323273, the DOPAS project.
Below this list you will found public Deliverables as pdf.
If you have questions relating to anthe Deliverables you are welcome to contact either the author or the DOPAS coordinator.
D7.5 Project description for the EC FP7 project compendium
Deliverable Number |
Deliverable Title |
WP number |
Lead beneficiary number |
Nature[1] |
Dissemination level[2] |
Delivery date |
D1.1 |
D1.1 General Assembly meetings and minutes (dates indicative) |
1 |
1 |
O |
RE |
M3, M15, M26, M37, M44 |
D1.2 |
1 |
1 |
O |
PU |
M7 (M3) | |
D1.3 |
Dopas deliverable D1 3 DopasWebsiteandExtranet final (pdf) (645.5 KB) |
1 |
1 |
O |
PU |
M3-M48 |
D2.1 |
DOPAS Deliverable D2 1 Design Bases and Criteria v1 1 2 final SESAM (pdf) (5 MB) |
2 |
8 |
R |
PP |
M20 (M18) |
D2.2 |
D2.2 Reference Designs Report |
2 |
8 |
R |
PP |
M26 (M24) |
D2.3 |
D2.3 Strategies of demonstrating conformity of reference design to design basis |
2 |
8 |
R |
PP |
M38 (M36) |
D2.4 |
D2.4 WP2 Final Report |
2 |
8 |
R |
PU |
M43 (M41) |
D3.1 |
D3.1 FSS Experiment |
3 |
2 |
D |
PU |
M42 |
D3.2 |
D3.2 FSS tunnel model design report |
3 |
2 |
R |
RE |
M8 (M6) Submitted |
D3.3 |
D3.3 Report on clayish material definition for FSS |
3 |
2 |
R |
RE |
M8 (M6) |
D3.4 |
D3.4 Report on low-pH concrete formulas for FSS Combined into the D3.8 |
3 |
2 |
R |
RE |
M8 (M6) |
D3.5 |
D3.5 Lab test report on the performance of the clayish material for FSS |
3 |
2 |
R |
PP |
M8 (M6) |
D3.6 |
D3.6 Lab report on the performance of low-pH concrete for FSS Combined into the D3.8 |
3 |
2 |
R |
PU |
M8 (M6) |
D3.7 |
D3.7 Test report on FSS metric core emplacement |
3 |
2 |
R |
RE |
M11 (M9) |
D3.8 |
3 |
2 |
R |
RE |
M11 (M9) | |
D3.9 |
D3.9 Test report on FSS test panel for shotcrete |
3 |
2 |
R |
RE |
M11 (M9) |
D3.10 |
3 |
2 |
R |
PP |
M18 (M16) | |
D3.11 |
3 |
2 |
R |
PP |
M18 (M16) | |
D3.12 |
D3.12 Report on construction of FSS swelling clay core |
3 |
2 |
R |
PP |
M18 (M16) |
D3.13 |
D3.13 Report on shotcrete plug construction |
3 |
2 |
R |
PP |
M18 (M16) |
D3.14 |
D3.14 EPSP experiment |
3 |
7 |
D |
PP |
M42 |
D3.15 |
D3.15 Detail design of EPSP plug |
3 |
7 |
R |
PP |
M19 |
D3.16 |
3 |
7, |
R |
PU |
M8 | |
D3.17 |
3 |
7 |
R |
PP |
M11 | |
D3.18 |
D3.18 Testing plan for EPSP instrumentation and monitoring |
3 |
7 |
R |
PP |
M19 |
D3.19 |
D3.19 EPSP Functionalities demonstration |
3 |
9 |
R |
PP |
M25 (M22) |
D3.20 |
D3.20 EPSP Plug test installation report |
3 |
7 |
R |
PU |
M27 (M28) |
D3.21 |
D3.21 Final laboratory test report of EPSP |
3 |
7 |
R |
PU |
M40 |
D3.22 |
D3.22 DOMPLU experiment |
3 |
8 |
D |
PU |
M42 |
D3.23 |
D3.23 POPLU experiment |
3 |
1 |
D |
PU |
M42 |
D3.24 |
D3.24 Detailed design of POPLU deposition tunnel end plug |
3 |
1 |
O |
RE |
M12 Submitted |
D3.25 |
D3.25 Test plan for the full-scale test including the instrumentation plan for POPLU plug |
3 |
1 |
O |
RE |
(M15) M12 Submitted |
D3.26 |
3 |
1 |
O |
PP |
M14 | |
D3.27 |
D3.27 POPLU concrete test memorandum |
3 |
1 |
O |
RE |
M14 Submitted |
D3.28 |
D3.28 Status report on ELSA laboratory tests |
3 |
4 |
R |
PP |
M24 (M18) |
D3.29 |
D3.29 Final Technical Report ELSA related testing |
3 |
4 |
R |
PU |
M42 |
D3.30 |
D3.30 WP3 Final summary report |
3 |
2 |
O |
PU |
M44 |
D3.31 |
D3.31 Final Technical Report on ELSA related testing of mechanical - hydraulic behaviour of the shaft seal (LASA) |
3 |
4 |
R |
PU |
M42 |
D3.32 |
D3.32 Final technical report on sealing behaviour of clay rock (THM-TON) |
3 |
4 |
R |
PU |
M42 |
D4.1 |
D4.1 Report on qualification of commissioning methods |
4 |
2, 5 |
R |
PP |
M18 |
D4.2 |
D4.2 Report on bentonite saturation test |
4 |
2, 5 |
R |
PP |
M32 (M30) |
D4.3 |
D4.3 DOMPLU experiment summary report |
4 |
8 |
R |
PU |
M36 |
D4.4 |
D4.4 WP4 Integrated Report |
4 |
6 |
R |
PU |
M40 |
D4.5 |
D4.5 POPLU experiment summary report |
4 |
1 |
R |
PU |
M40 |
D4.6 |
D4.6 Monitoring data from EPSP plug test summary report |
4 |
7 |
R |
PU |
M26 |
D4.7 |
D4.7 EPSP experiment summary report |
4 |
9 |
R |
PU |
M44 |
D4.8 |
D4.8 FSS experiment summary report |
4 |
2 |
R |
PU |
M44 |
D5.1 |
D5.1 Modelling plan for EPSP PA |
5 |
7 |
O |
PU |
M20 |
D5.2 |
D5.2 Report on Andra’s PA methodology for sealing systems |
5 |
2 |
R |
PP |
M18 |
D5.3 |
D5.3 Report on Andra’s understanding of processes involved in time and space |
5 |
2 |
R |
PP |
M18 |
D5.4 |
D5.4 Report on approach concerning uncertainties |
5 |
2 |
R |
PP |
M24 |
D5.5 |
D5.5 Status report on process modelling activities |
5 |
4 |
R |
PP |
M24 |
D5.6 |
D5.6 Status report on conceptual and integrated modelling activities |
5 |
4 |
R |
PP |
M24 Submitted |
D5.7 |
D5.7 Models and modelling summary report for EPSP |
5 |
7 |
R |
PU |
M40 |
D5.8 |
D5.8 Final report on process, conceptual and integrated modelling activities |
5 |
4 |
R |
PU |
M42 |
D5.9 |
D5.9 Integration of results of demonstrators in total repository system's PA by special performance indicators. |
5 |
10 |
R |
PU |
M42 |
D5.10 |
D5.10 WP5 Final integrated report |
5 |
4 |
R |
PU |
M45 (M44) |
D6.1 |
D6.1 Plan for the integrating analysis by experts and selection of experts |
6 |
1 |
O |
PP |
M26 |
D6.2 |
D6.2 Expert staff visit travel reports |
6 |
1 |
O |
RE |
M36 (M30) |
D6.3 |
D6.3 EE documentation (in Work Report format) from Expert Group EE meetings inputs and outcomes |
6 |
1 |
R |
PU |
M46 (M43) |
D6.4 |
D6.4 DOPAS Final Project Summary Report |
6 |
1 |
R |
PU |
M48 |
D7.1 |
7 |
1 |
R |
PU |
M4 | |
D7.2 |
D7.2 Plug and Seal Training Workshop planning and implementation report |
7 |
1 |
R |
PU |
M39 |
D7.3 |
D7.3 Organisation and publication of proceeding an international seminar in 2016 |
7 |
1 |
R |
PU |
M44 |
D7.4 |
D7.4 Publishing in total six newsletters in pdf-format at 9 months interval on the IGD-TP/DOPAS website |
7 |
1 |
R |
PU |
M9. M18, M27, M36, M45, M48 |
D7.5 |
7 |
1 |
R |
PU |
M8 (M4) | |
D7.6 |
D7.6 Two journalist edited 2-page summary documents of project's scientific and technical achievement |
7 |
1 |
R |
PU |
M47 |
D7.7 |
D7.7 Experiment poster of DOMPLU with EC acknowledgements at the underground site in Äspö (Sweden) |
7 |
8 |
O |
PU |
M7 (M3) |
D7.8 |
D7.8 Experiment poster of POPLU with EC acknowledgements at the ONKALO site (Finland) |
7 |
1 |
O |
PU |
M12 |
D7.9 |
D7.9 Experiment poster of FSS at the underground site with EC acknowledgements in BURE (France) |
7 |
2 |
O |
PU |
M7 (M3) |
D7.10 |
7 |
9 |
O |
PU |
M8 |
[1] R = Report, P = Prototype, D = Demonstrator, O = Other
[2] PU = Public
PP = Restricted to other programme participants (including the Commission Services)
RE = Restricted to a group specified by the consortium (including the Commission Services)
CO = Confidential, only for members of the consortium (including the Commission Services)
Please note that PP Deliverables does represent work in progress and does not represent the official view of the publishing organisation.
D1 2 DOPASProjectPlan final ver1 0 (pdf) (1.2 MB)
Dopas deliverable D1 3 DopasWebsiteandExtranet final (pdf) (645.5 KB)
DOPAS Deliverable D3 8 FSS Low pH SCC (pdf) (1.3 MB)
DOPAS Deliverable D3 10 FSS Drift model construction report (pdf) (3.6 MB)
DOPAS Deliverable D3.11 FSS Cast concrete plug construction-Final Version B (pdf) (1.4 MB)
DOPAS D3 16 testingplanEPSPlab 20052013 (pdf) (1.2 MB)
DOPAS Deliverable D3 17 Interim results of EPSP laboratory testing 13 (pdf) (1.7 MB)
Dopas deliverable D7 1DisseminationPlan (pdf) (1.4 MB)
DOPAS Deliverable D7 5 Project description (pdf) (4.2 MB)
DOPAS Deliverable D7 7 DOMPLU poster ver3 (pdf) (7 MB)
DOPAS deliverable D7 8 POPLU Poster (pdf) (4.7 MB)
DOPAS Deliverable D7 9 FSS poster final (pdf) (3.7 MB)
English DOPAS press release 31122012 Posiva (pdf) (296.3 KB)
DOPAS EC GA 323273 Deliverable 6-1-1 EE pilot consensus memorandum v2 (pdf) (1.3 MB)
DOPAS Deliverable 7.11.1 SESAM (pdf) (1.7 MB)