 Please find here the list of DOPAS Deliverables for all work packages.

Below this list you will found public Deliverables as pdf.

If you have  questions relating to anthe Deliverables you are welcome to contact either the author or the DOPAS coordinator.

 

D7.5 Project description for the EC FP7 project compendium

Delive­rable Number

Deliverable Title

WP number

Lead benefi­ciary number

Nature[1]

Dissemi­nation level[2]

Delivery date

D1.1

D1.1 General Assembly meetings and minutes (dates indicative)

1

1

O

RE

M3, M15, M26, M37, M44

D1.2

D1 2 DOPASProjectPlan final ver1 0 (pdf) (1.2 MB)

1

1

O

PU

M7 (M3)

D1.3

Dopas deliverable D1 3 DopasWebsiteandExtranet final (pdf) (645.5 KB)

1

1

O

PU

M3-M48

D2.1

 DOPAS Deliverable D2 1 Design Bases and Criteria v1 1 2 final SESAM (pdf) (5 MB)

2

8

R

PP

M20 (M18)

D2.2

D2.2 Reference Designs Report

2

8

R

PP

M26 (M24)

D2.3

D2.3 Strategies of demonstrating conformity of reference design to design basis

2

8

R

PP

M38 (M36)

D2.4

D2.4 WP2 Final Report

2

8

R

PU

M43 (M41)

D3.1

D3.1 FSS Experiment

3

2

D

PU

M42

D3.2

D3.2 FSS tunnel model design report

3

2

R

RE

M8 (M6)

Submitted

D3.3

D3.3 Report on clayish material definition for FSS

3

2

R

RE

M8 (M6)

D3.4

D3.4 Report on low-pH concrete formulas for FSS

Combined into the D3.8 

3

2

R

RE

M8 (M6)

D3.5

D3.5 Lab test report on the performance of the clayish material for FSS

3

2

R

PP

M8 (M6)

D3.6

D3.6 Lab report on the performance of low-pH concrete for FSS

Combined into the D3.8 

3

2

R

PU

M8 (M6)

D3.7

D3.7 Test report on FSS metric core emplacement

3

2

R

RE

M11 (M9)

D3.8

D3.8 Test report on FSS cast in-box concrete

3

2

R

RE

M11 (M9)

D3.9

D3.9 Test report on FSS test panel for shotcrete

3

2

R

RE

M11 (M9)

D3.10

D3.10 Drift model FSS construction report

3

2

R

PP

M18 (M16)

D3.11

D3.11 Report on FSS cast concrete plug construction

3

2

R

PP

M18 (M16)

D3.12

D3.12 Report on construction of FSS swelling clay core

3

2

R

PP

M18 (M16)

D3.13

D3.13 Report on shotcrete plug construction

3

2

R

PP

M18 (M16)

D3.14

D3.14 EPSP experiment

3

7

D

PP

M42

D3.15

D3.15 Detail design of EPSP plug

3

7

R

PP

M19

D3.16

DOPAS D3 16 testingplanEPSPlab 20052013 (pdf) (1.2 MB)

3

7,

R

PU

M8

D3.17

D3.17 Interim results of EPSP laboratory testing

3

7

R

PP

M11

D3.18

D3.18 Testing plan for EPSP instrumentation and monitoring

3

7

R

PP

M19

D3.19

D3.19 EPSP Functionalities demonstration

3

9

R

PP

M25 (M22)

D3.20

D3.20 EPSP Plug test installation report

3

7

R

PU

M27 (M28)

D3.21

D3.21 Final laboratory test report of EPSP

3

7

R

PU

M40

D3.22

D3.22 DOMPLU experiment

3

8

D

PU

M42

D3.23

D3.23 POPLU experiment

3

1

D

PU

M42

D3.24

D3.24 Detailed design of POPLU deposition tunnel end plug

3

1

O

RE

M12

Submitted

D3.25

D3.25 Test plan for the full-scale test including the instrumentation plan for POPLU plug

3

1

O

RE

(M15) M12

Submitted

D3.26

D3.26 URCF RSC work memorandum (POPLU)

3

1

O

PP

M14

D3.27

D3.27 POPLU concrete test memorandum

3

1

O

RE

M14

Submitted

D3.28

D3.28 Status report on ELSA laboratory tests

3

4

R

PP

M24 (M18)

D3.29

D3.29 Final Technical Report ELSA related testing

3

4

R

PU

M42

D3.30

D3.30 WP3 Final summary report

3

2

O

PU

M44

D3.31

D3.31 Final

Technical Report on ELSA related testing of mechanical - hydraulic behaviour of the shaft seal (LASA)

3

4

R

PU

M42

D3.32

D3.32 Final technical report on sealing behaviour of clay rock (THM-TON)

3

4

R

PU

M42

D4.1

D4.1 Report on qualification of commissioning methods

4

2, 5

R

PP

M18

D4.2

D4.2 Report on bentonite saturation test

4

2, 5

R

PP

M32 (M30)

D4.3

D4.3 DOMPLU experiment summary report

4

8

R

PU

M36

D4.4

D4.4 WP4 Integrated Report

4

6

R

PU

M40

D4.5

D4.5 POPLU experiment summary report

4

1

R

PU

M40

D4.6

D4.6 Monitoring data from EPSP plug test summary report

4

7

R

PU

M26

D4.7

D4.7 EPSP experiment summary report

4

9

R

PU

M44

D4.8

D4.8 FSS experiment summary report

4

2

R

PU

M44

D5.1

D5.1 Modelling plan for EPSP PA

5

7

O

PU

M20

D5.2

D5.2 Report on Andra’s PA methodology for sealing systems

5

2

R

PP

M18

D5.3

D5.3 Report on Andra’s understanding of processes involved in time and space

5

2

R

PP

M18

D5.4

D5.4 Report on approach concerning uncertainties

5

2

R

PP

M24

D5.5

D5.5 Status report on process modelling activities

5

4

R

PP

M24

D5.6

D5.6 Status report on conceptual and integrated modelling activities

5

4

R

PP

M24

Submitted

D5.7

D5.7 Models and modelling summary report for EPSP

5

7

R

PU

M40

D5.8

D5.8 Final report on process, conceptual and integrated modelling activities

5

4

R

PU

M42

D5.9

D5.9 Integration of results of demonstrators in total repository system's PA by special performance indicators.

5

10

R

PU

M42

D5.10

D5.10 WP5 Final integrated report

5

4

R

PU

M45 (M44)

D6.1

D6.1 Plan for the integrating analysis by experts and selection of experts

6

1

O

PP

M26

D6.2

D6.2 Expert staff visit travel reports

6

1

O

RE

M36 (M30)

D6.3

D6.3 EE documentation (in Work Report format) from Expert Group EE meetings inputs and outcomes

6

1

R

PU

M46 (M43)

D6.4

D6.4 DOPAS Final Project Summary Report

6

1

R

PU

M48

D7.1

D7.1 Dissemination Plan (incl. exploitation)

7

1

R

PU

M4

D7.2

D7.2 Plug and Seal Training Workshop planning and implementation report

7

1

R

PU

M39

D7.3

D7.3 Organisation and publication of proceeding an international seminar in 2016

7

1

R

PU

M44

D7.4

D7.4  Publishing in total six newsletters in pdf-format at 9 months interval on the IGD-TP/DOPAS website

7

1

R

PU

M9. M18, M27, M36, M45, M48

D7.5

DOPAS Deliverable D7 5 Project description (pdf) (4.2 MB)

7

1

R

PU

M8 (M4)

D7.6

D7.6 Two journalist edited 2-page summary documents of project's scientific and technical achievement

7

1

R

PU

M47

D7.7

D7.7 Experiment poster of DOMPLU with EC acknowledgements at the underground site in Äspö (Sweden)

7

8

O

PU

M7 (M3)

D7.8

D7.8 Experiment poster of POPLU with EC acknowledgements at the ONKALO site (Finland)

7

1

O

PU

M12

D7.9

D7.9 Experiment poster of FSS at the underground site with EC acknowledgements in BURE (France)

7

2

O

PU

M7 (M3)

D7.10

D7.10 Experiment poster of EPSP at the underground site with EC acknowledgements in URC Josef Gallery (Czech Republic)

7

9

O

PU

M8



[1]           R =  Report, P =  Prototype, D =  Demonstrator, O = Other

[2]           PU = Public

             PP = Restricted to other programme participants (including the Commission Services)

             RE = Restricted to a group specified by the consortium (including the Commission Services)

             CO = Confidential, only for members of the consortium (including the Commission Services)

 

 

Please note that PP Deliverables does represent work in progress and does not represent the official view of the publishing organisation.