Short information about DOPAS Project also in following languages:

 

suomenlippu Suomeksi

 

saksanlippu

 Auf Deutsch

 

ranskanlippu En français

 

 




The research leading to these results has received funding from the European Union's European Atomic Energy Community's (Euratom) Seventh Framework Programme FP7/2007-2013 under grant agreement no 323273, the DOPAS project.


DOMPLU progress


Latest news from DOMPLU Experiment

DOMPLU Experiment was installed first of DOPAS Experiments in March 2013 and the data freeze for DOPAS reporting was achieved in September 2014. The summary report will be published during 2016.

 

 

 


System design background reports for DOMPLU available in the SKB Publications

The summary of DOMPLU Experiment will be published within DOPAS but the plug experiment has a comprehensive amount of work behind which has been done prior the start of DOPAS project. First reports has now been published at SKB web page and can be downloaded.

 

 

SKB P-13-37 System design of Dome Plug. Creep properties at high stress levels of concrete for deposition tunnel plugs. Flansbjer, Mathias 1); Magnusson, Jonas 2)

 

 

 

SKB P-13-38 System design of Dome plug. Mechanical properties of rock-concrete interface Flansbjer, Mathias 1); Magnusson, Jonas 2)

 

 


The plans and current status was presented in a Poster at Euradwaste 2013 conference.
Print DOMPLU poster October 2013 (pdf) (80.7 MB)
SKB has published a web-article related to progress of the Domplu experiment and its further plans.


Follow this link:

http://skb.se/Templates/Standard____35953.aspx