Please find here the list of DOPAS Deliverables for all work packages.
Below this list you will found public Deliverables as pdf.
If you have questions relating to the Deliverables you are welcome to contact either the author or the DOPAS coordinator.
Please note that PP Deliverables does represent work in progress and does not represent the official view of the publishing organisation. Some of the PP Deliverables can be download from here and some of the PP Deliverables will be available here in the end of DOPAS project, but they are available upon request, when ready.
Deliverable Number |
Deliverable Title |
WP number |
Lead beneficiary number |
Nature[1] |
Dissemination level[2] |
Delivery date | Status |
D1.1 |
D1.1 General Assembly meetings and minutes (dates indicative) |
1 |
1 |
O |
RE |
M3, M15, M26, M37, M44 | 5/5 ready, only for DOPAS partners |
D1.2 |
1 |
1 |
O |
PU |
M7 (M3) | Ready | |
D1.3 |
1 |
1 |
O |
PU |
M3-M48 | Ready | |
D2.1 |
DOPAS Deliverable D2 1 Design Bases and Criteria v1 1 2 final SESAM (pdf) (5 MB) |
2 |
8 |
R |
PP |
M20 (M18) | Ready |
D2.2 |
2 |
8 |
R |
PP |
M26 (M24) | Ready | |
D2.3 |
D2.3 Strategies of demonstrating conformity of reference design to design basis |
2 |
8 |
R |
PP |
M38 (M36) | Ready, available on request |
D2.4 |
2 |
8 |
R |
PU |
M43 (M41) | Ready | |
D3.1 |
3 |
2 |
D |
PU |
M42 | Ready | |
D3.2 |
D3.2 FSS tunnel model design report |
3 |
2 |
R |
RE |
M8 (M6)
| Ready |
D3.3 |
D3.3 Report on clayish material definition for FSS Combined into the D3.7 |
3 |
2 |
R |
RE |
M8 (M6) | Ready |
D3.4 |
D3.4 Report on low-pH concrete formulas for FSS Combined into the D3.8 |
3 |
2 |
R |
RE |
M8 (M6) | Ready |
D3.5 |
D3.5 Lab test report on the performance of the clayish material for FSS Combined into the D3.7 |
3 |
2 |
R |
PP |
M8 (M6) | Ready |
D3.6 |
D3.6 Lab report on the performance of low-pH concrete for FSS Combined into the D3.8 |
3 |
2 |
R |
PU |
M8 (M6) | Ready |
D3.7 |
3 |
2 |
R |
RE |
M11 (M9) | Ready | |
D3.8 |
3 |
2 |
R |
RE |
M11 (M9) | Ready | |
D3.9 |
D3.9 Test report on FSS test panel for shotcrete |
3 |
2 |
R |
RE |
M11 (M9) | Ready |
D3.10 |
3 |
2 |
R |
PP |
M18 (M16) | Ready | |
D3.11 |
3 |
2 |
R |
PP |
M18 (M16) | Ready | |
D3.12 |
D3.12 Report on construction of FSS swelling clay core |
3 |
2 |
R |
PP |
M18 (M16) | |
D3.13 |
3 |
2 |
R |
PP |
M18 (M16) | Ready | |
D3.14 | D3.14 EPSP experiment |
3 |
7 |
D |
PP |
M42 | Ready |
D3.15 |
D3.15 Detail design of EPSP plug |
3 |
7 |
R |
PP |
M19 | Ready, available on request |
D3.16 |
3 |
7, |
R |
PU |
M8 | Ready | |
D3.17 |
3 |
7 |
R |
PP |
M11 | Ready | |
D3.18 |
D3.18 Testing plan for EPSP instrumentation and monitoring |
3 |
7 |
R |
PP |
M19 | Ready |
D3.19 |
D3.19 EPSP Functionalities demonstration |
3 |
9 |
R |
PP |
M25 (M22) | Ready, available on request |
D3.20 |
3 |
7 |
R |
PU |
M27 (M28) | Ready | |
D3.21 |
3 |
7 |
R |
PU |
M40 | Ready | |
D3.22 |
3 |
8 |
D |
PU |
M42 | Ready | |
D3.23 | D3.23 POPLU experiment |
3 |
1 |
D |
PU |
M42 | Ready |
D3.24 |
D3.24 Detailed design of POPLU deposition tunnel end plug |
3 |
1 |
O |
RE |
M12 Submitted | Ready |
D3.25 |
D3.25 Test plan for the full-scale test including the instrumentation plan for POPLU plug |
3 |
1 |
O |
RE |
(M15) M12 Submitted | Ready |
D3.26 |
3 |
1 |
O |
PP |
M14 | Ready | |
D3.27 |
D3.27 POPLU concrete test memorandum |
3 |
1 |
O |
RE |
M14 Submitted | Ready |
D3.28 |
D3.28 Status report on ELSA laboratory tests |
3 |
4 |
R |
PP |
M24 (M18) | Ready, available on request |
D3.29 |
D3.29 Final Technical Report ELSA related testing on chemical-hydraulical behaviour - LAVA |
|
4 |
R |
PU |
M42 | Ready |
D3.30 |
3 |
2 |
O |
PU |
M44 | Ready | |
D3.31 |
D3.31 Final Technical Report on ELSA related testing of mechanical - hydraulic behaviour of the shaft seal (LASA) |
3 |
4 |
R |
PU |
M42 | Ready |
D3.32 |
D3.32 Final technical report on sealing behaviour of clay rock (THM-TON) |
3 |
4 |
R |
PU |
M42 | Ready |
D4.1 |
4 |
2, 5 |
R |
PP |
M18 | Ready | |
D4.2 |
4 |
2, 5 |
R |
PP |
M32 (M30) | Ready | |
D4.3 |
4 |
8 |
R |
PU |
M36 | Ready | |
D4.4 |
4 |
6 |
R |
PU |
M40 | Raedy | |
D4.5 |
4 |
1 |
R |
PU |
M40 | Ready | |
D4.6 |
4 |
7 |
R |
PU |
M26 | Ready | |
D4.7 |
4 |
9 |
R |
PU |
M44 | Ready | |
D4.8 |
4 |
2 |
R |
PU |
M44 | Ready | |
D4.9 | D4.9 Lessons learnt for other programmes | 4 | 6 | R | PU | M48 | Extra Deliverable |
D5.1 |
5 |
7 |
O |
PU |
M20 | Ready | |
D5.2 |
D5.2 Report on Andra’s PA methodology for sealing systems |
5 |
2 |
R |
PP |
M18 | Ready, available on request |
D5.3 |
D5.3 Report on Andra’s understanding of processes involved in time and space |
5 |
2 |
R |
PP |
M18 | Ready, available on request |
D5.4 |
D5.4 Report on approach concerning uncertainties |
5 |
2 |
R |
PP |
M24 | Ready, available on request |
D5.5 |
D5.5 Status report on process modelling activities |
5 |
4 |
R |
PP |
M24 | Ready, available on request |
D5.6 |
D5.6 Status report on conceptual and integrated modelling activities |
5 |
4 |
R |
PP |
M24 Submitted | Ready, available on request |
D5.7 |
5 |
7 |
R |
PU |
M40 | Ready | |
D5.8 |
D5.8 Final report on process, conceptual and integrated modelling activities |
5 |
4 |
R |
PU |
M42 | Ready |
D5.9 |
5 |
10 |
R |
PU |
M42 | Ready | |
D5.10 |
5 |
4 |
R |
PU |
M45 (M44) | Ready | |
D5.11 | D5.11 Status report on ELSA/LASA related laboratory tests and on process modelling activities | 5 | 4 | R | PP | M28 | Ready |
D5.12 | D5.12 Assessment of watertightness andmechanical integrity of POPLU plug | 5 | 1 | R | PU | Extra Deliverable | Ready |
D6.1 |
D6.1 Plan for the integrating analysis by experts and selection of experts |
6 |
1 |
O |
PP |
M26 | Ready |
D6.2 |
D6.2 Expert staff visit travel reports |
6 |
1 |
O |
RE |
M36 (M30) | All published see below |
D6.3 |
D6.3 EE documentation (in Work Report format) from Expert Group EE meetings inputs and outcomes |
6 |
1 |
R |
PU |
M46 (M43) | All published see below |
D6.4 |
6 |
1 |
R |
PU |
M48 | Ready to be uploaded here soon | |
D7.1 |
7 |
1 |
R |
PU |
M4 | Ready | |
D7.2 |
D7.2 Plug and Seal Training Workshop planning and implementation report |
7 |
1 |
R |
PU |
M48 (M39) | Ready |
D7.3 |
D7.3 Organisation and publication of proceeding an international seminar in 2016 |
7 |
1 |
R |
PU |
M44 | Ready |
D7.4 |
D7.4 Publishing in total six newsletters in pdf-format at 9 months interval on the IGD-TP/DOPAS website |
7 |
1 |
R |
PU |
M9. M18, M27, M36, M45, M48 | 6 are ready see below |
D7.5 | Dopas Deliverable D7.5 Project description (proposal) (pdf) (4.2 MB) |
7 |
1 |
R |
PU |
M8 (M4) | Ready |
D7.6 |
D7.6 Two journalist edited 2-page summary documents of project's scientific and technical achievement |
7 |
1 |
R |
PU |
M47 | Ready |
D7.7 |
D7.7 Experiment poster of DOMPLU with EC acknowledgements at the underground site in Äspö (Sweden) |
7 |
8 |
O |
PU |
M7 (M3) | Ready |
D7.8 |
D7.8 Experiment poster of POPLU with EC acknowledgements at the ONKALO site (Finland) |
7 |
1 |
O |
PU |
M12 | Ready |
D7.9 |
D7.9 Experiment poster of FSS at the underground site with EC acknowledgements in BURE (France) |
7 |
2 |
O |
PU |
M7 (M3) | Ready |
D7.10 |
7 |
9 |
O |
PU |
M8 | Ready |
[1] R = Report, P = Prototype, D = Demonstrator, O = Other
[2] PU = Public
PP = Restricted to other programme participants (including the Commission Services)
RE = Restricted to a group specified by the consortium (including the Commission Services)
CO = Confidential, only for members of the consortium (including the Commission Services)
Please note that PP Deliverables does represent work in progress and does not represent the official view of the publishing organisation.
Deliverables
WP1
D1 2 DOPASProjectPlan final ver1 0 (pdf) (1.2 MB)
D1.3 DOPAS Website and Extranet (pdf) (645.5 KB)
WP3
DOPAS Deliverable D3.8 FSS Low pH SCC (pdf) (1.3 MB)
DOPAS Deliverable D3 10 FSS Drift model construction report (pdf) (3.6 MB)
DOPAS Deliverable D3.11. FSS Cast concrete construction (pdf) (1.4 MB)
DOPAS D3 16 testingplanEPSPlab 20052013 (pdf) (1.2 MB)
DOPAS Deliverable D3 17 Interim results of EPSP laboratory testing 13 (pdf) (1.7 MB)
WP6
DOPAS_D6_1 _ WP6 Plan for integrating analysis_final (pdf) (221.6 KB)
DOPAS D6_2 Expert staff visit travel reports 1 FSS experiment (pdf) (2 MB)
DOPAS_Deliverable_D6-2-1_ESPS_Visit_Report (pdf) (572.2 KB)
DOPAS_Deliverable_D6-2-2_POPLU_Visit_Report_v2 (pdf) (2.9 MB)
DOPAS_D6_3_WP6 Elicitation WP2 concensus meeting_final (pdf) (1.9 MB)
DOPAS_Deliverable_D6_3_1_Elicitation_D3-30_consensus_memorandum (pdf) (2.2 MB)
DOPAS_Deliverable_D6_3_2_ Elicitation_D4-4_consensus_memorandum (pdf) (2.9 MB)
DOPAS_Deliverable_D6_3_3_Elicitation_D5_10_consensus_memorandum (pdf) (2.7 MB)
WP7
DOPAS deliverable D7.1_DisseminationPlan (pdf) (1.4 MB)
Dopas Deliverable D7.5 Project description (proposal) (pdf) (4.2 MB)
DOPAS Deliverable D7 7 DOMPLU poster ver3 (pdf) (7 MB)
DOPAS deliverable D7 8 POPLU Poster (pdf) (4.7 MB)
DOPAS Deliverable D7 9 FSS poster final (pdf) (3.7 MB)
DOPAS Newsletters
DOPAS Newsletter 1 issued July 2013 (pdf) (3.1 MB)
DOPAS Newsletter 2 issued 09062014 (pdf) (4.1 MB)
Dopas Deliverable D7_4_3_Newsletter 3 (pdf) (5.1 MB)
DOPAS_Deliverable D7_4_4_Newsletter 4 (pdf) (1.6 MB)
DOPAS D7_4_5_Newsletter 5 (pdf) (1.6 MB)
DOPAS_Newsletter_6_DOPAS 2016_web (pdf) (3.6 MB)
Press release
English DOPAS press release 31122012 Posiva (pdf) (296.3 KB)
Extra Deliverables
DOPAS EC GA 323273 Deliverable 6-1-1 EE pilot consensus memorandum v2 (pdf) (1.3 MB)
DOPAS Deliverable 7.11.1 SESAM (pdf) (1.7 MB)