Short information about DOPAS Project also in following languages:

 

suomenlippu Suomeksi

 

saksanlippu

 Auf Deutsch

 

ranskanlippu En français

 

 




The research leading to these results has received funding from the European Union's European Atomic Energy Community's (Euratom) Seventh Framework Programme FP7/2007-2013 under grant agreement no 323273, the DOPAS project.


 Please find here the list of DOPAS Deliverables for all work packages.

Below this list you will found public Deliverables as pdf.

If you have  questions relating to the Deliverables you are welcome to contact either the author or the DOPAS coordinator.

 

Please note that PP Deliverables does represent work in progress and does not represent the official view of the publishing organisation. Some of the PP Deliverables can be download from here and some of the PP Deliverables will be available here in the end of DOPAS project, but they are available upon request, when ready.

 

Delive­rable Number

Deliverable Title

WP number

Lead benefi­ciary number

Nature[1]

Dissemi­nation level[2]

Delivery date

 Status

D1.1

D1.1 General Assembly meetings and minutes (dates indicative)

1

1

O

RE

M3, M15, M26, M37, M44

5/5 ready, only for DOPAS partners

D1.2

D1 2 DOPASProjectPlan final ver1 0 (pdf) (1.2 MB)

1

1

O

PU

M7 (M3)

Ready

D1.3

D1.3 DOPAS Website and Extranet (pdf) (645.5 KB)

1

1

O

PU

M3-M48

Ready

D2.1

 DOPAS Deliverable D2 1 Design Bases and Criteria v1 1 2 final SESAM (pdf) (5 MB)

2

8

R

PP

M20 (M18)

Ready

D2.2

D2.2 Reference Designs Report

2

8

R

PP

M26 (M24)

Ready

D2.3

D2.3 Strategies of demonstrating conformity of reference design to design basis

2

8

R

PP

M38 (M36)

Ready, available on request

D2.4

D2.4 WP2 Final Report

2

8

R

PU

M43 (M41)

 Ready

D3.1

D3.1 FSS Experiment

3

2

D

PU

M42

 Ready

D3.2

D3.2 FSS tunnel model design report

3

2

R

RE

M8 (M6)

 

Ready 

D3.3

D3.3 Report on clayish material definition for FSS

Combined into the D3.7

3

2

R

RE

M8 (M6)

 Ready

D3.4

D3.4 Report on low-pH concrete formulas for FSS

Combined into the D3.8 

3

2

R

RE

M8 (M6)

Ready

D3.5

D3.5 Lab test report on the performance of the clayish material for FSS

Combined into the D3.7

3

2

R

PP

M8 (M6)

 Ready

D3.6

D3.6 Lab report on the performance of low-pH concrete for FSS

Combined into the D3.8 

3

2

R

PU

M8 (M6)

Ready

D3.7

D3.7 Test report on FSS metric core emplacement

3

2

R

RE

M11 (M9)

 Ready

D3.8

D3.8 Test report on FSS cast in-box concrete

3

2

R

RE

M11 (M9)

Ready 

D3.9

D3.9 Test report on FSS test panel for shotcrete

3

2

R

RE

M11 (M9)

 Ready

D3.10

D3.10 Drift model FSS construction report

3

2

R

PP

M18 (M16)

Ready 

D3.11

D3.11 Report on FSS cast concrete plug construction

3

2

R

PP

M18 (M16)

Ready 

D3.12

D3.12 Report on construction of FSS swelling clay core

3

2

R

PP

M18 (M16)

 

D3.13

D3.13 Report on shotcrete plug construction

3

2

R

PP

M18 (M16)

 Ready

D3.14

D3.14 EPSP experiment

3

7

D

PP

M42

 Ready

D3.15

D3.15 Detail design of EPSP plug

3

7

R

PP

M19

Ready, available on request 

D3.16

DOPAS D3 16 testingplanEPSPlab 20052013 (pdf) (1.2 MB)

3

7,

R

PU

M8

Ready 

D3.17

D3.17 Interim results of EPSP laboratory testing

3

7

R

PP

M11

Ready 

D3.18

D3.18 Testing plan for EPSP instrumentation and monitoring

3

7

R

PP

M19

Ready 

D3.19

D3.19 EPSP Functionalities demonstration

3

9

R

PP

M25 (M22)

 Ready, available on request

D3.20

D3.20 EPSP Plug test installation report

3

7

R

PU

M27 (M28)

 Ready

D3.21

D3.21 Final laboratory test report of EPSP

3

7

R

PU

M40

 Ready

D3.22

D3.22 DOMPLU experiment

3

8

D

PU

M42

Ready

D3.23


 D3.23 POPLU experiment

3

1

D

PU

M42

 Ready

D3.24

D3.24 Detailed design of POPLU deposition tunnel end plug

3

1

O

RE

M12

Submitted

Ready 

D3.25

D3.25 Test plan for the full-scale test including the instrumentation plan for POPLU plug

3

1

O

RE

(M15) M12

Submitted

Ready 

D3.26

D3.26 URCF RSC work memorandum (POPLU)

3

1

O

PP

M14

Ready 

D3.27

D3.27 POPLU concrete test memorandum

3

1

O

RE

M14

Submitted

Ready 

D3.28

D3.28 Status report on ELSA laboratory tests

3

4

R

PP

M24 (M18)

Ready, available on request 

D3.29

D3.29 Final Technical Report ELSA related testing on chemical-hydraulical behaviour - LAVA


4

R

PU

M42

 Ready

D3.30

D3.30 WP3 Final summary report

3

2

O

PU

M44

 Ready

D3.31

D3.31 Final Technical Report on ELSA related testing of mechanical - hydraulic behaviour of the shaft seal (LASA)

3

4

R

PU

M42

 Ready

D3.32

D3.32 Final technical report on sealing behaviour of clay rock (THM-TON)

3

4

R

PU

M42

 Ready

D4.1

D4.1 Report on qualification of commissioning methods

4

2, 5

R

PP

M18

 Ready

D4.2

D4.2 Report on bentonite saturation test

4

2, 5

R

PP

M32 (M30)

 Ready

D4.3

D4.3 DOMPLU experiment summary report

4

8

R

PU

M36

 Ready

D4.4

D4.4 WP4 Integrated Report

4

6

R

PU

M40

 Raedy

D4.5

D4.5 POPLU experiment summary report

4

1

R

PU

M40

 Ready

D4.6

D4.6 Monitoring data from EPSP plug test summary report

4

7

R

PU

M26

 Ready

D4.7

D4.7 EPSP experiment summary report

4

9

R

PU

M44

 Ready

D4.8

D4.8 FSS experiment summary report

4

2

R

PU

M44

 Ready
D4.9D4.9 Lessons learnt for other programmes 4 6 RPU M48 Extra Deliverable

D5.1

D5.1 Modelling plan for EPSP PA

5

7

O

PU

M20

Ready 

D5.2

D5.2 Report on Andra’s PA methodology for sealing systems

5

2

R

PP

M18

Ready, available on request 

D5.3

D5.3 Report on Andra’s understanding of processes involved in time and space

5

2

R

PP

M18

Ready, available on request 

D5.4

D5.4 Report on approach concerning uncertainties

5

2

R

PP

M24

Ready, available on request 

D5.5

D5.5 Status report on process modelling activities

5

4

R

PP

M24

Ready, available on request 

D5.6

D5.6 Status report on conceptual and integrated modelling activities

5

4

R

PP

M24

Submitted

Ready, available on request 

D5.7

D5.7 Models and modelling summary report for EPSP

5

7

R

PU

M40

 Ready

D5.8

D5.8 Final report on process, conceptual and integrated modelling activities

5

4

R

PU

M42

 Ready

D5.9

D5.9 Integration of results of demonstrators in total repository system's PA by special performance indicators.

5

10

R

PU

M42

 Ready

D5.10

D5.10 WP5 Final integrated report

5

4

R

PU

M45 (M44)

 Ready
D5.11 D5.11 Status report on ELSA/LASA related laboratory tests and on process modelling activities 54RPPM28 Ready
D5.12D5.12 Assessment of watertightness andmechanical integrity of POPLU plug 5 1 R PUExtra Deliverable Ready

D6.1

D6.1 Plan for the integrating analysis by experts and selection of experts

6

1

O

PP

M26

 Ready

D6.2

D6.2 Expert staff visit travel reports

6

1

O

RE

M36 (M30)

 All published see below

D6.3

D6.3 EE documentation (in Work Report format) from Expert Group EE meetings inputs and outcomes

6

1

R

PU

M46 (M43)

 All published see below

D6.4

D6.4 DOPAS Final Project Summary Report

6

1

R

PU

M48

 Ready to be uploaded here soon

D7.1

D7.1 Dissemination Plan (incl. exploitation)

7

1

R

PU

M4

Ready 

D7.2

D7.2 Plug and Seal Training Workshop planning and implementation report

7

1

R

PU

M48 (M39)

 Ready

D7.3

D7.3 Organisation and publication of proceeding an international seminar in 2016

7

1

R

PU

M44

 Ready

D7.4

D7.4  Publishing in total six newsletters in pdf-format at 9 months interval on the IGD-TP/DOPAS website

7

1

R

PU

M9. M18, M27, M36, M45, M48

6 are ready 

see below

D7.5

Dopas Deliverable D7.5 Project description (proposal) (pdf) (4.2 MB)

7

1

R

PU

M8 (M4)

Ready 

D7.6

D7.6 Two journalist edited 2-page summary documents of project's scientific and technical achievement

7

1

R

PU

M47

 Ready

D7.7

D7.7 Experiment poster of DOMPLU with EC acknowledgements at the underground site in Äspö (Sweden)

7

8

O

PU

M7 (M3)

Ready 

D7.8

D7.8 Experiment poster of POPLU with EC acknowledgements at the ONKALO site (Finland)

7

1

O

PU

M12

Ready 

D7.9

D7.9 Experiment poster of FSS at the underground site with EC acknowledgements in BURE (France)

7

2

O

PU

M7 (M3)

Ready 

D7.10

D7.10 Experiment poster of EPSP at the underground site with EC acknowledgements in URC Josef Gallery (Czech Republic)

7

9

O

PU

M8

Ready 


[1]           R =  Report, P =  Prototype, D =  Demonstrator, O = Other

[2]           PU = Public

             PP = Restricted to other programme participants (including the Commission Services)

             RE = Restricted to a group specified by the consortium (including the Commission Services)

             CO = Confidential, only for members of the consortium (including the Commission Services)

 

 

Please note that PP Deliverables does represent work in progress and does not represent the official view of the publishing organisation.